Riverbend – building the studio [part 3]
Putting on the roof… cont.
2 weeks later we were back at Riverbend with a spiffy machine that Terry designed to lift the panels.
This was a LOT easier than hoisting them up the 12 feet using only brute force. Let’s hear it for machines and the engineers who build them!
With the porch on, the roof was complete!
but we won’t put the metal roof panels on until warmer weather in the spring so on went another set of tarps for the winter.
I could not have gotten my dream of a studio built without this amazing ‘TAG team’= Terry A Gruber & Tristan A Gruber!! Well done, Gentlemen!